Subject
A laminar flow cabinet with an A clean zone in the surroundings of the B zone.
Scope of work
The scope of qualification included the following components:
Effect
As it was legacy equipment, the DQ was limited to verifying if the equipment was still capable of satisfying the basic legal requirements according to the technical documentation. At the IQ stage, the available technical documentation was verified and the correctness of installation confirmed. The OQ and PQ qualifications were combined in one stage during which all the measurements concerning air quality and the laminarity of flow were taken and the control and monitoring system was tested.
SHARE ON:
Subscribe to our newsletter and stay up to date
eConsulting provides specialised IT services to business centers and leading international firms. From the beginning, the firm which was established in 2002 has strived to achieve the goals of continuous and sustainable development.